



The facility is developed on 693,000 square meters of prime water frontage land. It lies adjacent to Laem Chabang Port and is accessible by protected deep water, rail link and an excellent road system. The facility has a slipway, tow load-out jetties and 390 meters long quayside for loading heavy and large fabrication modules.
The purpose-built heavy fabrication facility comprises covered fabrication bays, blasting and painting facilities and extensive external fabrication and assembly areas serviced by gantry cranes.